Centering and Shuttering Including Strutting and Propping A Complete GuideKeywords centering and shuttering, strutting and propping, formwork construction, concrete support systems, shuttering techniques, temporary supports for concreteIn the world of concrete construction, the process of shaping and supporting fresh concrete until it hardens is vital. This is where centering and shuttering, along with strutting and propping, come into play. These temporary structures are essential to ensure that concrete elements retain their intended shape and structural integrity during curing.
This guide breaks down the basics of centering, shuttering, strutting, and propping, their roles in formwork construction, and why proper planning and execution are crucial for successful concrete works.
What Is Centering and Shuttering?
Centering refers to the temporary support system used mainly for horizontal structures such as slabs, arches, and beams. It provides stability underneath these elements until the concrete gains enough strength to support its own weight.
Shuttering, on the other hand, is the term used for the vertical or side enclosures that mold the concrete into its desired shape. This includes the walls, sides of beams, columns, and footings.
Together, centering and shuttering form the complete formwork system, which is removed once the concrete has sufficiently cured.
Importance of Formwork in Concrete Construction
Formwork plays a key role in construction. It
-
Defines the shape and size of the concrete structure
-
Maintains alignment and stability during curing
-
Transfers the load of wet concrete safely to the ground
-
Helps achieve a smooth and uniform surface finish
If formwork is not done properly, it can lead to deformation, cracking, or collapse of the concrete element.
Understanding Strutting and Propping
Strutting and propping are techniques used to reinforce the formwork system and distribute the load more evenly.
-
Strutting involves placing diagonal supports that brace the formwork against lateral pressure or shifting.
-
Propping uses vertical members (props) that bear the vertical loads and keep the centering stable, especially in slab or beam formwork.
These supports are often made of timber, steel, or adjustable telescopic props and are removed only after the concrete has achieved enough strength.
Materials Used in Centering and Shuttering
The most common materials include
-
Timber Easy to use and cost-effective, ideal for small-scale works
-
Plywood Used on surfaces that need a smoother finish
-
Steel Durable and reusable, preferred in large or repetitive projects
-
Aluminum Lightweight and easy to handle, though more expensive
Choice of material depends on the type of project, budget, and surface finish requirements.
Key Components of a Formwork System
1. Panels
These are the actual surfaces that touch the concrete and shape it.
2. Bearers and Joists
Support the weight of wet concrete and distribute the load to props.
3. Props
Vertical supports that hold up the panels and joists.
4. Struts
Slanted or diagonal supports that stabilize the formwork against lateral movement.
5. Ties and Clamps
Hold the shuttering in place and resist pressure from freshly poured concrete.
Steps in Centering and Shuttering Work
-
Site Preparation Ensure the foundation is level and compacted.
-
Material Inspection Check the formwork materials for strength and cleanliness.
-
Installation of Shuttering Place the vertical panels as per the design dimensions.
-
Positioning of Centering Install horizontal supports below slabs and beams.
-
Strutting and Propping Place diagonal and vertical supports for reinforcement.
-
Alignment and Leveling Check for plumb, level, and correct dimensions.
-
Pouring Concrete Once everything is secure, concrete can be poured.
-
Curing and Removal After curing, the supports and panels are carefully removed.
Safety Measures in Formwork and Propping
-
Ensure all props and struts are placed on firm ground or solid base plates
-
Use bracing for tall or multi-level supports
-
Inspect the setup before concrete pouring to check for any instability
-
Do not remove formwork too early; allow for proper curing time
-
Workers should wear personal protective equipment (PPE) when working around formwork
Common Problems and How to Avoid Them
-
Bulging of formwork Caused by inadequate strutting or poor panel quality Solution Use stronger materials and reinforce with diagonal struts.
-
Honeycombing in concrete Due to gaps in shuttering or poor compaction Solution Seal all joints properly and vibrate concrete during pouring.
-
Uneven surface finish Caused by dirty or damaged shuttering surfaces Solution Clean panels thoroughly and use proper release agents.
Time Required Before Removing Formwork
The time before formwork removal depends on weather, concrete grade, and element type
-
Vertical formwork (columns, walls) 24 to 48 hours
-
Slabs (props left underneath) 3 to 7 days
-
Beams (props left underneath) 7 to 10 days
-
Final removal of props After 14 to 21 days, depending on span and load
Always follow structural engineer guidance or local construction codes for exact durations.
Role of Formwork in Project Cost and Quality
Formwork can contribute up to 20-25% of the total cost of a concrete structure. Good planning and reuse of shuttering materials can help reduce this significantly.
High-quality formwork
-
Reduces finishing work
-
Minimizes waste
-
Enhances structural safety
-
Speeds up construction timelines
Centering and shuttering, including strutting and propping, form the backbone of safe and effective concrete construction. These temporary systems ensure that structural elements are formed accurately and remain stable during curing. By understanding the materials, setup, safety measures, and removal timing, contractors and builders can achieve better results and prevent costly mistakes. Investing in good formwork practices ultimately leads to stronger, safer, and more durable structures.